Projects we can point to, and what changed
Each one is written up in full: what the problem was, what we built, and the measured result. The first is ours as Advanced Informatics. The other three are earlier work by our team, before the company.
Real-time integration for a recycling operator's AI contamination detection
17 times peak loadWe connected an on-truck contamination-detection platform to a national waste operator's operational systems: one integration service, four connected flows, built on Azure with infrastructure as code and continuous testing. On this project it was built, tested and load-proven in under four weeks, to 17 times peak load.
Read the integration case studyMaking releases boring at a UK high-street retailer
45% to 95%A major retailer was rolling back 45% of its e-commerce releases. One shared branch, merge-time feature gating and a single release process took deployment success to 95%, and the tooling built to run it is still the core of that process ten years on.
Read the retail case study72,000 households, one regulator's deadline
Inside 12 monthsA rule change extended compost collections to every household in the country. A team of three analysed a 310,000-customer base, resourced the collection rounds and ran the rollout to 72,000 of them inside the regulator's 12-month deadline.
Read the rollout case studyHalving the invoicing behind 310,000 customers
20 hours to 10A national operator was billing through 10 to 12 billing types and thousands of separate prices for the same services. Consolidating them cut manual invoicing from 20 hours a week to 10, and became a review that has run every year since.
Read the billing case study